[Infographic] Telescoping Base Stand Assembly

March 20, 2018

Telescoping Base Stand AssemblyLearn how to properly assemble a telescoping base stand from NuAire to fit anyone of our Biosafety Cabinets (BSC), Laminar Airflow Workstations (LAFW), Containment Ventilated Enclosure (CVE), and Pharmacy Compounding Isolators (CAI and CACI).

Previous Flipbook
[Instructions] Stainless Steel Water Pan NU-5842 Operation and Installation
[Instructions] Stainless Steel Water Pan NU-5842 Operation and Installation

Installation and operation instructions for NuAire CO2 Incubator stainless steel water pan model number NU-...

Next Flipbook
[Instructions] NU-1553 CO2 Incubator Stacking Table Operation and Maintenance Manual
[Instructions] NU-1553 CO2 Incubator Stacking Table Operation and Maintenance Manual

The NU-1553 stacking table is designed to support a second Autoflow or In-VitroCell CO2 Incubator over the ...