Flow Chart for USP 797 and USP 800 PEC Requirements

January 12, 2017

With the release of USP 800 it may have left some searching for answers. Follow this flow chart for an easy method to identify what Primary Engineering Control (PEC) you should be using in your Secondary Engineering Control (SEC).

Previous Flipbook
[White Paper] Can a Class I and Class II BSC be in the same Sterile Hazardous Drug (HD) Room?
[White Paper] Can a Class I and Class II BSC be in the same Sterile Hazardous Drug (HD) Room?

USP 800 does not directly address the pre-sterilization process of a sterile preparation creating the quest...

Next Flipbook
Biosafety Cabinet Operating Label
Biosafety Cabinet Operating Label